UAE Fire Rating Guide for Structural Steel
How fire resistance ratings are set for UAE buildings under the UAE Fire and Life Safety Code of Practice, which tests prove them, and how a rating becomes a coating thickness on site.
What a fire rating means
A fire rating (fire resistance rating) is a period of time: 30, 60, 90, 120, 180 or 240 minutes. It is how long a building element keeps doing its job in a standard furnace fire. “2-hour”, “120 minutes” and “R120” all describe the same requirement.
Two points are often missed. First, a rating belongs to a tested system, not to a paint on its own: the product, the steel section, the thickness applied and the limiting steel temperature together. Second, it is a measure taken in a standard test so that systems can be compared. It does not predict how long a real fire will burn.
Who sets the fire rating in the UAE
The UAE Fire and Life Safety Code of Practice is the fire code in every emirate. The 2018 edition is current, and Civil Defence in each emirate enforces it and adds circulars and local amendments. The Dubai Building Code lists the UAE Fire and Life Safety Code as one of its references.
On a project, the fire and life safety consultant applies the code in the fire strategy and marks the required rating for each element on the drawings, and Civil Defence approves them. The fireproofing contractor then works to those approved ratings. Oil, gas and military clients such as ADNOC and the Command of Military Works also run their own contractor approvals and specifications on top of the code.
UAE building height categories
The code groups buildings by the height of the highest occupied floor, measured from the lowest ground level or the lowest fire service access level. The category, together with the building’s use, drives most fire safety requirements, including the construction type.
| Category | Height of highest occupied floor |
|---|---|
| Low-rise | Up to 15 m |
| Mid-rise | 15 m to 23 m |
| High-rise | 23 m to 90 m |
| Super high-rise | Above 90 m |
Basements are classified separately: up to two levels or 7 m below the exit level is “low depth”, and deeper basements are “high depth”.
Fire ratings by construction type
Chapter 1 of the code sorts buildings into construction types. The minimum type is set by the occupancy (business, residential, assembly, storage and so on), the height category and whether the building is sprinklered. Tall buildings and higher-risk uses generally end up in Type I.
The three digits in a type name are the ratings in hours for the exterior bearing walls, the main structural frame and the floors. Type I (442), for example, means 4-hour bearing walls, a 4-hour frame and 2-hour floors.
| Construction type | Main frame1 | Floor–ceiling assemblies | Columns carrying the roof only | Beams carrying the roof only |
|---|---|---|---|---|
| Type I (442) | 4 h | 2 h | 3 h | 2 h |
| Type I (332) | 3 h | 2 h | 2 h | 2 h |
| Type II (222) | 2 h | 2 h | 1 h | 1 h |
| Type II (111) | 1 h | 1 h | 1 h | 1 h |
| Type II (000) | Not rated | Not rated | Not rated | Not rated |
1 Columns, beams, girders and trusses that support more than one floor, bearing walls or other columns. In Type I buildings, members that carry one floor only can be one step lower: columns 3 h in Type I (442) and 2 h in Type I (332), and beams 2 h in both. Beams that frame into columns and keep the building stable normally need the same rating as those columns. Combustible construction (Types III, IV and V) is limited to a few small building uses, such as villas and kiosks.
Use this table to understand a specification, not to set one. The rating that counts is the one in the approved fire strategy and on the Civil Defence approved drawings.
Fire curves and test standards
A rating is proven in a furnace test that follows a set time–temperature curve. Which curve applies depends on what could burn.
Offices, homes, malls, hotels, warehouses
Ordinary contents such as furniture, paper and fit-out. Tested on the standard ISO 834 curve, which BS 476-20 and EN 1363-1 also use. ASTM E119 / UL 263 uses a similar curve.
- BS 476 Parts 20 and 21
- EN 13381-8 (reactive coatings such as intumescents) and EN 13381-4 (passive products such as cementitious sprays and boards)
- UL 263 / ASTM E119
Oil and gas, petrochemical, power, fuel storage
Burning fuel heats far faster than a building fire. These tests reach peak temperature within minutes, so the systems tested to them are different.
- UL 1709: the furnace reaches 1,093 °C within 5 minutes
- EN 1363-2 hydrocarbon curve: levels off at about 1,100 °C
- ISO 22899-1 for jet fires from pressurised leaks
On these projects the usual choice is epoxy intumescent, or cementitious for heavy sections.
The UAE code lists BS 476-20/21 and EN 13381-8 among its referenced standards. Whichever standard the specification names, two things must hold:
- The product must have a UAE Civil Defence certificate of conformity (CoC). Certification bodies approved by Civil Defence issue it after type testing and a factory audit. Check that the certificate is current and covers the exact product.
- The thickness must come from data tested to the standard the specification names. A DFT read from a BS 476 table can’t be used where the specification calls for EN 13381-8, or the other way round.
From fire rating to coating thickness
Steel loses strength as it heats. At 550 °C, hot-rolled structural steel keeps about 60% of its room-temperature load capacity, which is why 550 °C became the classic limiting temperature for columns in BS 476 tests. Loaded beams carrying a concrete slab are taken to about 620 °C.
Eurocode design (EN 1993-1-2) works out a critical temperature for each member from the load it carries, and EN 13381-8 assessments give thicknesses across a range of temperatures, typically 350–750 °C. The dry film thickness (DFT) is then read from the product’s certified loading table using four inputs:
Small changes in those inputs make large changes in thickness. Published EN 13381-8 data for one solvent-based intumescent at R60 shows this:
Illustrative published data for one product, shown only to explain the trend. It is not a specification. Always use the loading table of the approved product.
Work out the section factor of any I-section, hollow section or tube with our free Hp/A section factor calculator.
Which fireproofing suits which rating
Thin-film intumescent
Usually 30–120 minutes, with 180 minutes on some specifically tested systems. A thin, paint-like finish for exposed and architectural steel in buildings. Water-based for interiors, solvent-based where conditions are harsher.
Intumescent paintsCementitious spray
Up to 4 hours. Economical for high ratings and heavy sections where the steel is hidden behind ceilings or cladding, and in car parks, plant rooms and industrial buildings.
Cementitious fireproofingEpoxy intumescent
For hydrocarbon fire ratings tested to UL 1709, and for steel exposed outdoors or to chemicals. Certified systems reach up to 4 hours. Used on oil and gas, petrochemical and utility projects.
Epoxy intumescentSee the products we apply, with their data sheets and certificates, on Fireproofing Materials & Data Sheets.
Fire rated vs fire retardant
The two terms are often mixed up, but they answer different questions, and only one of them gives steel a fire rating.
| Fire rated (fire resistance) | Fire retardant (reaction to fire) | |
|---|---|---|
| Question it answers | How long does the element keep working in a fire? | How easily does the surface catch fire and spread flame? |
| Result | Minutes, for example R60, EI 90, 2-hour | A class, for example A1 to F, Class 0 or Class A |
| Typical tests | BS 476-20/21/22, EN 13381, EN 13501-2, UL 263 / ASTM E119 | BS 476-6/7, EN 13501-1, ASTM E84 / UL 723 |
| Typical products | Intumescent and cementitious fireproofing on structural steel | Treatments for wood and fabric |
| Gives steel a fire rating? | Yes, at the tested thickness | No |
Before you price or apply: a 6-step checklist
- Get the rating for every element. Take it from the approved fire strategy or the Civil Defence stamped drawings. Columns, beams, roof members and bracing often differ.
- Confirm the critical temperature and the test standard. Ask the structural engineer or check the specification, for example “BS 476 at 550 °C” or “EN 13381-8 at 620 °C”. If neither is given, raise it before pricing.
- List every member with its section size and Hp/A. Note how many sides are exposed: beams under a slab are heated on three sides. Our calculator helps.
- Choose a product that fits. It needs a current Civil Defence certificate, test data to the specified standard, and suitability for the exposure (internal, external or hydrocarbon).
- Prepare the DFT schedule. Read each thickness from the certified loading table and submit the schedule with the data sheets and certificates for the consultant’s approval.
- Apply, measure and record. Check primer compatibility, apply in coats, measure the DFT on every member against the approved schedule, add the topcoat where required, and hand over the records for the Civil Defence inspection.
Send us your fire strategy and steel list
Ibtikar Fire Proofing is a UAE Civil Defence approved fireproofing contractor, with approvals from Dubai, Abu Dhabi and Sharjah Civil Defence, ADNOC and military authorities. Our QC team will check the ratings, work out the Hp/A of each member and return a DFT schedule from the approved product’s loading table.
Fire rating FAQs
What fire rating does structural steel need in the UAE?
It depends on the construction type the UAE Fire and Life Safety Code requires for the building’s use, height category and sprinkler protection. The main frame needs 1 hour in Type II (111), 2 hours in Type II (222), 3 hours in Type I (332) and 4 hours in Type I (442). The rating for each element is set in the approved fire strategy.
Is a 2-hour fire rating the same as R120?
Yes. A 2-hour rating, 120 minutes and R120 all mean the element must keep carrying its load for 120 minutes in the standard fire test. R is the load-bearing criterion used for structural steel.
Can intumescent paint achieve 3 or 4 hours?
Thin-film intumescent coatings usually cover 30 to 120 minutes, and 180 minutes only on specifically tested systems. For 3 to 4 hours in buildings, cementitious spray is the usual choice. Epoxy intumescents tested to UL 1709 reach up to 4 hours against hydrocarbon fires.
Who approves fireproofing on a UAE project?
The fire and life safety consultant sets the ratings in the fire strategy and Civil Defence approves it. The product needs a UAE Civil Defence certificate of conformity, the consultant approves the DFT schedule, and the work is inspected before handover. Oil, gas and military clients add their own approvals.
Does it matter if the data is BS 476 or EN 13381-8?
Yes. The specification names the test standard and often the critical steel temperature. The DFT must be read from the product’s loading table for that standard and temperature, because tables from different standards give different thicknesses.
What is the difference between fire rated and fire retardant paint?
Fire rated (fire resistant) coatings such as intumescents keep steel below its critical temperature for a set number of minutes. Fire retardant coatings slow ignition and flame spread on surfaces like wood or fabric, but they do not give steel a fire rating.
This guide is a summary for owners, contractors and consultants. It does not replace the UAE Fire and Life Safety Code of Practice, the local amendments in each emirate, or the approved fire strategy for your project. Always confirm requirements with your fire and life safety consultant and the Civil Defence authority for the site.