The Abu Dhabi Business Hub Warehouses fireproofing project is located in ICAD-1, Mussafah, Abu Dhabi, UAE, where Ibtikar delivered professional structural steel fireproofing and passive fire protection solutions for Abu Dhabi Business. Covering approximately 13,000 m² of steelwork, the project was completed in June 2023 using Intumescent Paints with Nullifire SC802, spray-applied to provide reliable protection in accordance with the specified 60-minute fire-resistance requirement.
Ibtikar’s scope included the application of the fireproofing system to primary and secondary structural steel members such as columns, beams, connections, and other critical steelwork. Our team strictly managed surface preparation, primer compatibility, coating application, and dry film thickness (DFT) verification at every stage. All fireproofing activities were executed in accordance with approved project requirements, manufacturer recommendations, and applicable UAE passive fire protection and Civil Defence requirements.
Through controlled application and systematic quality inspections, Ibtikar delivered a durable, fully compliant, and properly documented fireproofing system engineered to preserve the structural integrity of the building during fire exposure.
Explore more Ibtikar projects or contact our team to learn about our structural steel fireproofing, intumescent coating, and passive fire protection services across the UAE and GCC.