https://ibtikar-uae.com/wp-content/uploads/2024/05/PHOTO-2024-04-25-20-00-26-1.jpg
960
1280
admin
https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg
admin2024-05-18 11:30:002025-09-25 13:50:575-Star Hotel: Fireproofing the Future of Hospitality in Ras Al Khaimah
About
Tim Aerospace Aircraft MRO Hangar
As a premier fireproofing contractor in the UAE and GCC, Ibtikar Fireproofing executed crucial fireproofing for the Tim Aerospace Aircraft MRO Hangar. Our specialized team applied Nullifire SC804 to protect 25,500 square meters of Steel Structure in March 2024, completed with a Carbothane 137HS top coat. This project showcases our dedication to safety in specialized aerospace environments.
Project Highlights:
- Successfully secured an extensive 25,500 square meters of steel structure for an aerospace facility.
- Implemented high-performance Nullifire SC804 for robust fire resistance.
- Applied Carbothane 137HS as a durable top coat for enhanced protection.
- Ensured adherence to rigorous safety protocols for high-tech industrial sites.
Project Gallery
Tim Aerospace Aircraft MRO Hangar
680
Hours of Work
March 2024
Project Date
25,500
Surface Area
Steel Structure
Apply on
Nullifire SC804
Material









