• Home
  • About Us
  • Services
    • Intumescent Paints
    • Cementitious Paint
    • Solvent Coating
    • Epoxy Intumescent
    • Cable Protective Coating
    • Fabric Fire-retardant
    • Wood Fire Retardant
  • Projects
  • News
  • Careers
  • Contact us
  • Search
  • Menu Menu
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter

March 2024

Project Date

Steel Structure

Apply on

25,500

Surface Area (m2)

680

Hours of Work

Nullifire SC804

Material

About

Tim Aerospace Aircraft MRO Hangar

As a premier fireproofing contractor in the UAE and GCC, Ibtikar Fireproofing executed crucial fireproofing for the Tim Aerospace Aircraft MRO Hangar. Our specialized team applied Nullifire SC804 to protect 25,500 square meters of Steel Structure in March 2024, completed with a Carbothane 137HS top coat. This project showcases our dedication to safety in specialized aerospace environments.

Project Highlights:

  • Successfully secured an extensive 25,500 square meters of steel structure for an aerospace facility.
  • Implemented high-performance Nullifire SC804 for robust fire resistance.
  • Applied Carbothane 137HS as a durable top coat for enhanced protection.
  • Ensured adherence to rigorous safety protocols for high-tech industrial sites.

Project Gallery

Tim Aerospace Aircraft MRO Hangar

SC804 Nullifire

Fire Proofing Materiel:

Nullifire SC804 Intumescent Steel Coating

SC804 Nullifire

Nullifire SC804 Intumescent steel coating is a very low VOC, borate free, APEO free, water-based, thin film intumescent coating for the protection of structural steelwork. SC804 contains no substances of very high concern.

  • SC804 Nullifire Application Instructions 
  • SC804 Nullifire EN13381-6 Concrete Filled Hollow Columns
  • SC804 Nullifire Intumescent Coatings Brochure
  • SC804 Nullifire SC804 Safety Data Sheet

  • Ultra Low VOC.
  • Competitive loadings.
  • Compatible with a wide range of primers and topcoats.
  • Easy to apply, with excellent aesthetics.
  • Optifire®+ unique traceability identifier.
  • Certifire CF5929.
  • 3 months without topcoat once fully dried (see Environmental Resistance section)

  • Nullifire SC804 is optimised to provide 90 minutes fire resistance to ‘I’ section beams and columns, hollow columns, hollow beams, cellular beams, concrete filled hollow columns and solid steel tension rods. Limited 120 minutes protection is also available. SC804 can be used on steel, cast iron and galvanised steel.

    Detailed application instructions are available for SC600, SC800 and SC900 series that must be consulted prior to commencing application.

    Safety data sheet must be read and understood before use.

  • Nullifire – Passive Fire Protection Solutions Including Fire Stopping Products and Intumescent Steel Coatings.

Fire Proofing Materiel:

Carbothane 137HS

Carbothane 137 HS is a fast-drying, high build, two component polyurethane coating which exhibits excellent dry times and handling characteristics required by Original Equipment Manufacturers. Has excellent UV resistance and good corrosion resistance in direct to metal applications for C1 to C3 environments, over primers for C4 to C5 environments.

  • Carbothane 137 HS Product Data Sheet
  • Carbothane 137 HS Part A Safety Data Sheet
  • Carbothane 137 HS Part B Safety Data Sheet

  • Fast-drying formulation
  • High build polyurethane coating
  • Two-component system
  • Excellent dry times and handling
  • Ideal for OEM (Original Equipment Manufacturer) applications

  • Nullifire – Passive Fire Protection Solutions Including Fire Stopping Products and Intumescent Steel Coatings.

Fireproofing Spray Application

On-Site Project Demo

Fireproofing the Future of Hospitality in Ras Al Khaimah
Intumescent Projects, News

5-Star Hotel: Fireproofing the Future of Hospitality in Ras Al Khaimah

https://ibtikar-uae.com/wp-content/uploads/2024/05/PHOTO-2024-04-25-20-00-26-1.jpg 960 1280 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-18 11:30:002025-09-25 13:50:575-Star Hotel: Fireproofing the Future of Hospitality in Ras Al Khaimah
RSA Cold Chain
Intumescent Projects, News

Ibtikar Fireproof Safeguards RSA Cold Chain Facility

https://ibtikar-uae.com/wp-content/uploads/2024/03/01-Main-Pictire-RSA-Cold-Chain-.webp 466 1164 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-16 11:26:502025-09-25 13:42:38Ibtikar Fireproof Safeguards RSA Cold Chain Facility
Emtelle
Intumescent Projects, News

Emtelle Blown Fibre and Ducted Network Cable Manufacturing Facility

https://ibtikar-uae.com/wp-content/uploads/2024/01/2-Emtelle.webp 1079 1920 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-16 11:05:442025-09-25 13:42:31Emtelle Blown Fibre and Ducted Network Cable Manufacturing Facility
Amazon Fulfillment Hub in Abu Dhabi
Intumescent Projects, News

Project Complete: Amazon Fulfillment Hub in Abu Dhabi

https://ibtikar-uae.com/wp-content/uploads/2024/05/PHOTO-2022-08-31-18-11-55-2-e1715772221951.jpg 480 1600 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-15 09:21:592025-09-25 13:50:24Project Complete: Amazon Fulfillment Hub in Abu Dhabi
FedEx Sort and Clearance Facility
Cementitious Projects, Intumescent Projects, News

FedEx Cargo Hub Achieves 2-Hour Fire Safety with Ibtikar Fire Proofing

https://ibtikar-uae.com/wp-content/uploads/2015/10/WEB-_P-06-FEDEX.webp 466 1165 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-15 07:54:242025-09-25 13:50:11FedEx Cargo Hub Achieves 2-Hour Fire Safety with Ibtikar Fire Proofing
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
  • Link to Instagram
  • Link to Youtube
680

Hours of Work

March 2024

Project Date

25,500

Surface Area

Steel Structure

Apply on

Nullifire SC804

Material

Contact Us

Saih Shuaib 3, Dubai, UAE

+971 56 765 5161

info@ibtikar-uae.com

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           8 AM – 5 PM
Saturday       8 AM – 5 PM
Sunday         Closed

Latest Projects

  • TECOM Investments WarehouseApril 24, 2025 - 12:53 pm
  • AWR Distribution Center DICSeptember 25, 2024 - 6:08 pm
  • Abu Dhabi Future School Phase 10September 1, 2024 - 11:59 am
  • RSA Cold Chain Phase 2July 24, 2024 - 11:59 am

Our Offices

Ibtikar Fireproofing company

-Silicon Oasis, Dubai

-Mussafah M 45, Abu Dhabi

-Al Musalla, Sharjah

-Al- Salihia Tower 303, Ras Al-Khaimah

-Umm Dera, Umm Al Quawain

 

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter
Mohammed Bin Salman Nonprofit CityMohammed Bin Salman Nonprofit CityMSM Logistic LLC
Scroll to top

WhatsApp us

Call Us