• Home
  • About Us
  • Services
    • Intumescent Paints
    • Cementitious Paint
    • Solvent Coating
    • Epoxy Intumescent
    • Cable Protective Coating
    • Fabric Fire-retardant
    • Wood Fire Retardant
  • Projects
  • News
  • Careers
  • Contact us
  • Search
  • Menu Menu
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter

150

Hours of Work

June 2020

Project Date

3,711 Sq m

Surface Area

Steel Structure

Apply on

Phoenix™ 370-90

Material

The English College - Dubai
The English College - Dubai

About The English College – Dubai

As a leading fireproofing company in the UAE, Al Ibtikar Al Hadeeth Technical Works specializes in protecting steel structures with fireproofing paint such as intumescent paint and cementitious fireproofing. Our projects include the likes of THE ENGLISH COLLEGE in Dubai, where we applied 3,711 square meters of fireproofing material to achieve a fire rating of 120 minutes. For this particular project, we used Water Based Intumescent Coating Sherwin-Williams Phoenix 370-90 and Cementitious FIRECUT F-1, both of which have been carefully selected for their superior fire protection properties.

Our expertise in the field of fireproofing has helped us establish a solid reputation in the market, with our use of high-quality materials and precise application methods ensuring optimal results. Our intumescent paint and cementitious fireproofing products are formulated with carefully selected ingredients to ensure the best possible composition and performance. These coatings work by expanding upon exposure to heat and forming a protective char layer, which effectively insulates the steel structure from the flames.

At Al Ibtikar Al Hadeeth Technical Works, we offer a range of fireproofing solutions, including Fire Retardant Paint, Intumescent Paint, Cementitious Coatings, Cable & Duct Coating, and more. Our products and services are designed to meet the diverse needs of our clients, and we take pride in our ability to provide effective and efficient solutions.

Keywords for Fire Proofing Intumescent: intumescent paint, intumescent coatings, sherwin-williams phoenix 370-60, sherwin-williams phoenix 370-90, fire retardant paint, fireproofing, intumescent, spray-on fireproofing for steel, smoke curtain, fire intumescent paint, intumescent paint ingredients, intumescent paint composition, how intumescent paint works, passive fire protection, uae fire.

Keywords for Fire Proofing Cementitious: cementitious, F-100 Spray-Applied Fire Resistive Material, Firecut F-100 Spray-Applied Fire Resistive Materials, cementitious spray fireproofing, cementitious fireproofing uae, passive fire protection, industrial fireproofing.

PreviousNext
12
AMAZON FULFILLMENT CENTER
AMAZON FULFILLMENT CENTER
Phoenix™ 370-90

Fire Proofing Materiel: Phoenix™ 370-90

A single component, water-based, thin-film, intumescent fire protection coating.

Phoenix 370-90 is a single component water-based TCEP-free thin-film intumescent coating for fire protection of structural steelwork.

Reach out to learn more about our products, or use our Data Sheet search to find the latest TDS and SDS content in any language.

Download

  • PHOENIX 370-90 Safety Data Sheet
  • PHOENIX 370-90 Product Data Sheet

Benefits

  • Provides up to 120 minutes fire resistance
  • Application to structural steel hollow and I-sections
  • Highly competitive loadings
  • Easy application properties

Brand

  • Phoenix Manufacturing Ltd.

Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
  • Link to Instagram
  • Link to Youtube
150

Hours of Work

June 2020

Project Date

3,711 Sq m

Surface Area

Steel Structure

Apply on

Phoenix™ 370-90

Material

Contact Us

Saih Shuaib 3, Dubai, UAE

+971 56 765 5161

info@ibtikar-uae.com

 

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           8 AM – 5 PM
Saturday       8 AM – 5 PM
Sunday         Closed

Latest Projects

  • 132KV Substation in Al Hudayriat IslandJune 9, 2025 - 12:54 pm
  • AWR Distribution Center DICOctober 1, 2024 - 11:59 am
  • RSA Cold Chain Phase 2September 24, 2024 - 11:59 am
  • Abu Dhabi Future School Phase 10September 1, 2024 - 11:59 am

Our Offices

Ibtikar Fireproofing company

-Silicon Oasis, Dubai

-Mussafah M 45, Abu Dhabi

-Al Musalla, Sharjah

-Al- Salihia Tower 303, Ras Al-Khaimah

-Umm Dera, Umm Al Quawain

 

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter
Al Barsha – Dubai – Union CoopAl Barsha - Dubai - Union CoopOaks Ibn Battuta Gate Hotel DubaiOaks Ibn Battuta Gate Hotel Dubai
Scroll to top

WhatsApp us

Call Us