• Home
  • About Us
  • Services
    • Intumescent Paints
    • Cementitious Paint
    • Solvent Coating
    • Epoxy Intumescent
    • Cable Protective Coating
    • Fabric Fire-retardant
    • Wood Fire Retardant
  • Projects
  • News
  • Careers
  • Contact us
  • Search
  • Menu Menu
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter

86

Hours of Work

November 2021

Project Date

3,000 Sq m

Surface Area

Steel Structure

Apply on

Akzonobel Interchar 212

Material

Layyah power plant in Sharjah
ayyah power plant in Sharjah

About Layyah power plant in Sharjah

At Al Ibtikar Al Hadeeth Technical Works, we are proud to offer the best fireproofing solutions in the UAE market. We specialize in protecting steel structures from fire damage by applying intumescent and cementitious fireproofing. One of our successful projects was the Layyah Power Plant in Sharjah, where we covered a steel surface area of 3,000 square meters with Interchar® 212 – AkzoNobel fireproofing material, providing up to 120 minutes of fire protection. Our team used epoxy-based intumescent fire-retardant coating, which is a water-based paint that expands when exposed to heat, creating a protective layer that insulates the steel from fire. We also used cementitious spray fireproofing, which provides an extremely durable and robust protective coating. Our expertise in passive fire protection and our use of top-quality AkzoNobel epoxy coatings make us the leading fireproofing company in the UAE. If you are looking for fire protection solutions for your steel structures, contact Al Ibtikar Al Hadeeth Technical Works, the experts in intumescent and cementitious fireproofing. Some important keywords for voice search optimization are intumescent paint, cementitious fireproofing, epoxy-based intumescent coating, passive fire protection, AkzoNobel epoxy paint, and fire retardant paint.

PreviousNext
12
AMAZON FULFILLMENT CENTER
AMAZON FULFILLMENT CENTER

Akzonobel Interchar 212

Fire Proofing Materiel: Akzonobel Interchar 212

Solvent-free Interchar 212 is a high build, robust, two component modified epoxy intumescent providing damage resistant fire and corrosion protection for the most demanding construction projects. Interchar 212 has excellent mechanical and physical properties, all backed up by rigorous third party testing and approvals.

Download

  • Akzonobel Interchar 212 Application Instruction
  • Akzonobel Interchar 212 Part B Safety Data Sheet
  • Akzonobel Interchar 212 Part A Safety Data Sheet

Features

  • This robust coating can be applied in the factory, which means that your steel components can be brought to the construction site and assembled there with complete fire protection. Interchar 212 is approved for pulp fires. This makes your process planning easier. Our extensive testing and approvals justify the trust you place in us. International Paint stands for high quality fire protection.

Benefits

  • 100% solids and therefore an extremely low VOC content contribute to the environmental compatibility of the building.
  • Independently tested for impact and blast resistance.
  • Approved to numerous fire safety standards.
  • Tested for flame spread, smoke generation and toxicity.
  • Can be used with many top coatings and colors, resulting in a wide range of design options.
  • Highly durable – robust product suitable for off-site processing as an alternative to on-site processing.
  • User-friendly as it is low-odour, thick-layered and quick-drying.
  • Almost no water absorption.
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
  • Link to Instagram
  • Link to Youtube
86

Hours of Work

November 2021

Project Date

3,000 Sq m

Surface Area

Steel Structure

Apply on

Akzonobel Interchar 212

Material

Contact Us

Saih Shuaib 3, Dubai, UAE

+971 56 765 5161

info@ibtikar-uae.com

 

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           8 AM – 5 PM
Saturday       8 AM – 5 PM
Sunday         Closed

Latest Projects

  • 132KV Substation in Al Hudayriat IslandJune 9, 2025 - 12:54 pm
  • AWR Distribution Center DICOctober 1, 2024 - 11:59 am
  • RSA Cold Chain Phase 2September 24, 2024 - 11:59 am
  • Abu Dhabi Future School Phase 10September 1, 2024 - 11:59 am

Our Offices

Ibtikar Fireproofing company

-Silicon Oasis, Dubai

-Mussafah M 45, Abu Dhabi

-Al Musalla, Sharjah

-Al- Salihia Tower 303, Ras Al-Khaimah

-Umm Dera, Umm Al Quawain

 

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter
DEWA PHASE III 800 MW PV SOLARDEWA PHASE III 800 MW PV SOLARAquaChemie jebel ali jafzaAquaChemie jebel ali jafza
Scroll to top

WhatsApp us

Call Us