Emirates pilot training expansion Fireproofing Project in UAE

Emirates pilot training expansion Fireproofing Al Garhoud, Dubai: Ibtikar applied Hempafire Pro 315 Solvent Intumescent Coating across 1,200 m² of structural steel to achieve a 120-Minutes fire rating, completed in March 2024.

Ibtikar-Simulator Project

Project Type Solvent Intumescent Coating

LocationAl Garhoud, Dubai

Area1,200 m²

Fire Rating120-Minutes

MaterialHempafire Pro 315

CompletionMarch 2024

Project Overview

The Emirates pilot training expansion is an Solvent Intumescent Coating project located in Al Garhoud, Dubai, UAE, where Ibtikar delivered professional structural steel fireproofing and passive fire protection solutions for Emirates Airlines. Covering approximately 1,200 m² of steelwork, the project was completed in March 2024 using Hempafire Pro 315 via airless spray fireproofing, selected to provide reliable protection in accordance with the specified 120-Minutes fire-resistance requirement.

Ibtikar’s scope included the application of the fireproofing system to primary and secondary structural steel members such as columns, beams, connections, and other critical steelwork. Our team strictly managed surface preparation, primer compatibility, coating application, and dry film thickness (DFT) verification at every stage. All fireproofing activities were executed in accordance with approved project requirements, manufacturer recommendations, and applicable UAE passive fire protection and Civil Defense requirements.

Through controlled application and systematic quality inspections, Ibtikar delivered a durable, fully compliant, and properly documented fireproofing system engineered to preserve the structural integrity of the building during fire exposure.

Explore more Ibtikar projects or contact our team to learn about our structural steel fireproofing, intumescent coating, and passive fire protection services across the UAE and GCC.

Emirates airline logo

Location: Al Garhoud, Dubai
Project Date: March 2024
Surface Area: 1,200 m²
Fire Rating: 120-Minutes
Application Method: Spray Fireproofing

Fireproofing Scope & Application

  • Structural Steel Protection

    Primary and secondary structural steel members — columns, beams and connections — are protected against fire exposure to maintain load-bearing capacity for the required fire-resistance period, in line with the project's passive fire protection strategy.

  • Intumescent Coating Application

    A reactive intumescent coating system is applied to prepared steel surfaces. Under fire exposure, the coating expands to form an insulating char layer that slows the rate of heat transfer to the substrate, delaying loss of structural strength.

  • Quality Control & Inspection

    Dry film thickness (DFT) is measured throughout application against the specified coating build-up. Each stage is documented with inspection records, culminating in a final walk-through and sign-off prior to handover.

Fire Protection System

A layered coating system builds up fire resistance on the steel substrate. Products and film thicknesses are project-specific — see the technical documents below.

  1. Layer 01

    Steel substrate

    Prepared structural steel, cleaned and profiled to the specified surface standard prior to coating.

  2. Layer 02

    Primer

    A compatible primer system protects the substrate and provides adhesion for the intumescent coating. Thickness per specification.

  3. Layer 03

    Intumescent coating

    The reactive fireproofing coating, applied to the dry film thickness specified for the project's required fire-resistance rating, from 60 up to 120 minutes. Under fire exposure it expands to form an insulating char layer.

  4. Layer 04

    Topcoat

    A protective topcoat is applied where specified, for UV resistance, weathering or a decorative finish.

Each layer depends on the one beneath it — primer adhesion determines how well the intumescent coating bonds to the steel, and the specified dry film thickness is what delivers the certified fire-resistance rating. Products and film thicknesses are project-specific: always confirm against the data sheets and the approved project specification before application.

Project Execution

  1. Stage 01

    Surface preparation

    • Steel surfaces cleaned and prepared to the standard the coating system requires
    • Preparation signed off before any coating is applied, so the system bonds correctly
  2. Stage 02

    Primer inspection

    • Primer film thickness and coverage checked across the steelwork
    • Intumescent application only proceeds once the primer passes
  3. Stage 03

    Intumescent application

    • Applied in controlled passes to build up the specified dry film thickness
    • Spray, brush or roller to suit the product and the site conditions
  4. Stage 04

    DFT inspection and handover

    • Dry film thickness measured at multiple points on each member and recorded against the project specification
    • Final joint inspection on completion, with documentation compiled and issued for handover and close-out

Surface preparation and primer sign-off come first for a reason — an intumescent coating applied over contaminated or incorrectly primed steel can fail to adhere, and that is found out long after the steel has been closed in. The DFT records are the evidence: the fire-resistance rating is only as good as the film thickness actually achieved on each member, which is why the readings are taken point by point and kept with the handover file.

Project Results

1,200 m²Protected Area

120-MinutesRequired Fire Rating

Solvent Intumescent Coating Coating System

CompletedProject Status

Approved 100%Inspection Status

Project Gallery

Fire Proofing Material

Hempafire Pro 315 | Solvent-Borne Intumescent Coating

CE-Marked Passive Fire Protection Optimised for R30/R60 Steel Sections. High-build single-coat application up to 1,600 µm DFT, backed by Certifire and Applus+ approvals.

Fire Resistance Rating Optimised R30/R60 (R90 Project-Dependent)
Volume Solids 75% ± 3%
Density / Specific Gravity 1.3 kg/L (11 lb/US gal)
Max Dry Film Thickness (DFT) 1,600 µm (63 mils) per coat
Max Wet Film Thickness (WFT) 2,133 µm (85 mils) per coat
VOC Content 345 g/L (2.88 lb/US gal)
Application Method Spray (200 bar); Brush/Roller Needs Extra Coats
Pack Size & Storage 20 Litres (15-Month Shelf Life @ 25°C)

Source: Hempafire Pro 315 Product Data Sheet (Hempel), cross-checked against a UK distributor listing for pack size. Rated up to 90 minutes overall — the data sheet describes it as optimised for R30/R60 fire resistance, with R90 achievable depending on the specific project's steel section and loading.

Substrate Preparation

  • Blast Cleaning: Abrasive blast to minimum Sa 2½ (ISO 8501-1) / SP 10 (SSPC).
  • Cleaning: High-pressure fresh water cleaning to remove salts.
  • Application Condition: Surface must be dry and clean, at a temperature at least 3°C (5°F) above the dew point.

Primer Systems

  • Only a Hempel-approved primer is acceptable and required — consult your Hempel representative for the current approved primer list for this substrate and exposure category.

Application

  • Method: Spray application at 200 bar pressure
  • Brush/Roller: Possible, but additional coats are needed to reach the specified dry film thickness
  • A topcoat cannot be applied until the specified intumescent thickness has been achieved.

Drying Schedule

A temperature-banded overcoating interval table was not published in the data sheet checked — it states drying/overcoating details are covered in separate Hempel Application Instructions. Confirm exact recoat windows with Hempel before specifying.

Third-Party Certifications & Compliance

  • CE Marking via European Technical Assessment ETA 18/0689.
  • Certifire Approval CF5726.
  • Applus+ Certificate APF-1562.
  • Tested to EN 13381-8 and EN 13381-9.
  • BS 476: Part 21.
  • AS 4100 (Australian steel structures standard).

Technical Documents

All four links are placeholders — point them at your own hosted files once confirmed.

Fire Proofing Material

Hempathane Fast Dry 55750 | Rapid-Turnaround Polyurethane Topcoat

Tough, UV-Stable Finish Coat With a 4-Hour Handling Time. Two-component polyurethane designed to speed up recoat schedules over primed or fireproofed steel.

Fire Resistance Rating N/A — Fast-Dry Finish Topcoat
Volume Solids 65%
Density / Specific Gravity 1.4 kg/L (11.9 lb/US gal)
Indicated Film Thickness 100 µm DFT / 150 µm WFT (Range 60–160 µm)
VOC Content 332 g/L (2.8 lb/US gal)
Application Method Airless Spray / Brush
Flash Point 29°C (84.2°F)
Pack Size & Storage 20 Litres (3-Year Shelf Life, Base)

Source: Hempathane Fast Dry 55750 Product Data Sheet (Hempel), cross-checked against a UK distributor listing for pack size. This is a two-component polyurethane finish topcoat, not a fire-resistance product — it is typically applied over a certified fireproofing or anti-corrosive system rather than tested for fire resistance itself.

Substrate Preparation

  • Apply to a dry, clean surface, free of contaminants.
  • For long overcoat intervals, clean thoroughly using a suitable detergent followed by high-pressure fresh water cleaning.

Primer Systems

  • Specific approved primer/undercoat names were not published in the data sheet checked for this product — confirm the recommended system with Hempel for your substrate.

Mixing & Application

  • Mixing Ratio (by volume): 9.1 : 0.9 — Base 55759 to Curing Agent 97050
  • Thinner: 08080, up to 5%
  • Spreading Rate: 6.5 m²/L (260.7 sq ft/US gal)
  • Pot Life: 2 hours @ 20°C (68°F)

Drying Schedule (at 20°C / 68°F)

Dry to Touch ~1 Hour
Dry to Handle ~4 Hours
Fully Cured 7 Days

Maximum service temperature is 120°C (248°F) under dry exposure. Figures are at 20°C (68°F) — confirm with Hempel for other site conditions.

Third-Party Certifications & Compliance

  • No third-party fire or corrosion certifications were named in the data sheet checked for this specific product — as a finish topcoat it is typically used as part of a certified coating system rather than certified independently. Confirm with Hempel if a specific approval is required for your project.

Technical Documents

All four links are placeholders — point them at your own hosted files once confirmed.

Why Choose Ibtikar

  • UAE project experience

    A track record of fireproofing delivered across the UAE's industrial, commercial and infrastructure sectors.

  • Specialised fireproofing expertise

    Dedicated focus on passive fire protection and intumescent coating systems for structural steel.

  • Professional quality control

    Documented dry film thickness inspection and quality checks at every stage, issued as a signed inspection report.

  • Technical and project support

    Technical guidance from specification and system selection through to inspection, handover and authority submission.

Frequently Asked Questions

This project used a Hempafire Pro 315 intumescent coating system, specified to deliver a 120-Minutes fire-resistance rating on exposed structural steel.

Steel is first cleaned and primed, then the intumescent coating is applied in controlled passes — by spray, brush or roller depending on the product and site conditions — to build up the specified dry film thickness.

The required rating is set by the project’s fire strategy and applicable building regulations, based on factors such as building use, height and occupancy. This determines the fire-resistance period the steelwork must achieve.

DFT is measured using a calibrated gauge at multiple points across each member and recorded against the thickness specified for the required fire rating, with results documented for inspection.

Coating thickness depends on the steel member’s section factor (Hp/A), the required fire-resistance period, and the specific product’s certified performance data.