New Project Template 02 Fireproofing Project in UAE

Professional fireproofing and passive fire protection works delivered by Ibtikar in the UAE.

Project Type Fire proofing

LocationDubai

Area33,500 m²

Fire Rating120 Min

MaterialSC 802

Completion2026

Project Overview

New Project Template 02 is a Intumescent Paint project located in Dubai, UAE, where Ibtikar delivered professional structural steel fireproofing and passive fire protection solutions. Covering approximately 33,500 m² of steelwork, the project was completed on 2026 using SC 802, selected to provide reliable protection in accordance with the specified 120 Min fire-resistance requirement.

Ibtikar’s scope included the application of the fireproofing system to structural steel members such as columns, beams, connections, and other critical steelwork. The works were carried out with careful attention to surface preparation, primer compatibility and inspection, coating application, and dry film thickness (DFT) verification. All fireproofing activities were managed in accordance with the approved project requirements, manufacturer recommendations, and applicable UAE passive fire protection and Civil Defense requirements.

Through controlled application and systematic quality inspections, Ibtikar provided a durable and properly documented fireproofing system designed to help maintain the structural integrity of the building during fire exposure.

Explore more Ibtikar projects and learn about our structural steel fireproofing, intumescent coating, and passive fire protection services across the UAE and GCC.

Client[CLIENT]
Main Contractor[MAIN CONTRACTOR]
LocationDubai
Project Date[PROJECT DATE]
Project TypeIntumescent Paint
Surface Area33,500 m²
Fire Rating120
MaterialSC 802
Application Method[APPLICATION METHOD]
Working Hours[WORKING HOURS]

Fireproofing Scope & Application

  • Structural Steel Protection

    Primary and secondary structural steel members — columns, beams and connections — are protected against fire exposure to maintain load-bearing capacity for the required fire-resistance period, in line with the project's passive fire protection strategy.

  • Intumescent Coating Application

    A reactive intumescent coating system is applied to prepared steel surfaces. Under fire exposure, the coating expands to form an insulating char layer that slows the rate of heat transfer to the substrate, delaying loss of structural strength.

  • Quality Control & Inspection

    Dry film thickness (DFT) is measured throughout application against the specified coating build-up. Each stage is documented with inspection records, culminating in a final walk-through and sign-off prior to handover.

Fire Protection System

A layered coating system builds up fire resistance on the steel substrate. Products and film thicknesses are project-specific — see the technical documents below.

  1. Layer 01

    Steel substrate

    Prepared structural steel, cleaned and profiled to the specified surface standard prior to coating.

  2. Layer 02

    Primer

    A compatible primer system protects the substrate and provides adhesion for the intumescent coating. Thickness per specification.

  3. Layer 03

    Intumescent coating

    The reactive fireproofing coating, applied to the dry film thickness specified for a [FIRE RATING] fire-resistance rating. Under fire exposure it expands to form an insulating char layer.

  4. Layer 04

    Topcoat

    A protective topcoat is applied where specified, for UV resistance, weathering or a decorative finish.

Each layer depends on the one beneath it — primer adhesion determines how well the intumescent coating bonds to the steel, and the specified dry film thickness is what delivers the certified fire-resistance rating. Products and film thicknesses are project-specific: always confirm against the data sheets and the approved project specification before application.

Project Execution

  1. Stage 01

    Surface preparation

    • Steel surfaces cleaned and prepared to the standard the coating system requires
    • Preparation signed off before any coating is applied, so the system bonds correctly
  2. Stage 02

    Primer inspection

    • Primer film thickness and coverage checked across the steelwork
    • Intumescent application only proceeds once the primer passes
  3. Stage 03

    Intumescent application

    • Applied in controlled passes to build up the specified dry film thickness
    • Spray, brush or roller to suit the product and the site conditions
  4. Stage 04

    DFT inspection

    • Dry film thickness measured at multiple points on each member
    • Readings recorded against the project specification
  5. Stage 05

    Final inspection and handover

    • Final joint inspection carried out on completion of the works
    • Documentation compiled and issued for handover and close-out

Surface preparation and primer sign-off come first for a reason — an intumescent coating applied over contaminated or incorrectly primed steel can fail to adhere, and that is found out long after the steel has been closed in. The DFT records are the evidence: the fire-resistance rating is only as good as the film thickness actually achieved on each member, which is why the readings are taken point by point and kept with the handover file.

Project Results

33,500 m²Protected Area

120 MinRequired Fire Rating

Intumescent Paint Coating System

CompletedProject Status

Approved 100%Inspection Status

Technical Documents

  • PDF

    Product data sheet

    Technical properties and specification of the coating system used.

    View document
  • PDF

    Application guide

    Recommended surface preparation and application procedure.

    View document
  • PDF

    Safety data sheet

    Handling, storage and safety information for the products used.

    View document
  • PDF

    Loading table

    Section factor and DFT loading table used to determine coating thickness.

    View document
  • PDF

    Fire test documentation

    Third-party fire test evidence supporting the specified rating.

    View document
  • PDF

    Inspection documentation

    Dry film thickness records and sign-off documentation for this project.

    View document

Project-specific documents — loading tables, fire test reports and inspection records — are issued against the system actually applied. If you need a document that is not listed here, ask us for it and we will send it directly.

Why Choose Ibtikar

  • UAE project experience

    A track record of fireproofing delivered across the UAE's industrial, commercial and infrastructure sectors.

  • Specialised fireproofing expertise

    Dedicated focus on passive fire protection and intumescent coating systems for structural steel.

  • Professional quality control

    Documented dry film thickness inspection and quality checks at every stage, issued as a signed inspection report.

  • Technical and project support

    Technical guidance from specification and system selection through to inspection, handover and authority submission.

Frequently Asked Questions

This project used a SC 802 intumescent coating system, specified to deliver a 120 fire-resistance rating on exposed structural steel.

Steel is first cleaned and primed, then the intumescent coating is applied in controlled passes — by spray, brush or roller depending on the product and site conditions — to build up the specified dry film thickness.

The required rating is set by the project’s fire strategy and applicable building regulations, based on factors such as building use, height and occupancy. This determines the fire-resistance period the steelwork must achieve.

DFT is measured using a calibrated gauge at multiple points across each member and recorded against the thickness specified for the required fire rating, with results documented for inspection.

Coating thickness depends on the steel member’s section factor (Hp/A), the required fire-resistance period, and the specific product’s certified performance data.

Planning a Fireproofing Project in the UAE?