April 2024

Project Date

Steel Structure

Apply on

31,000

Surface Area (m2)

1,400

Hours of Work

Nullifire SC802

Material

About

TECOM Investments Warehouse

btikar Fireproofing, a leading fireproofing contractor in the UAE and GCC, successfully completed comprehensive fireproofing works for the Design and Build of TECOM Investments Warehouse Phase 2 – TECOM. Focusing on 31,000 square meters of Steel Structure, our expert team applied Nullifire SC 802 in April 2024, followed by a Carbothane 137HS top coat. This monumental project underscores our capacity for large-scale industrial endeavors.

Project Highlights:

  • Provided advanced passive fire protection for an expansive 31,000 square meters of steel structure.
  • Utilized high-performance Nullifire SC 802 for superior fire resistance in a large warehouse.
  • Enhanced durability and finish with Carbothane 137HS top coat application.
  • Ensured full compliance with all relevant safety and civil defense standards for industrial developments.

Project Gallery

TECOM Investments Warehouse

PreviousNext
123456
SC802 Nullifire

Fire Proofing Materiel:

Nullifire SC802 Intumescent Steel Coating

SC802 Nullifire

Nullifire SC802 Intumescent steel coating is a very low VOC, borate free, APEO free, water based, thin film intumescent coating for the protection of structural steelwork. SC802 contains no substances of very high concern.

  • SC802 Nullifire Application Instructions
  • SC802 Nullifire Intumescent Coatings Brochure
  • SC802 Nullifire Loading Tables
  • SC802 Nullifire Safety Data Sheet

  • Water based intumescent coating suitable for internal use on structural steelwork for up to 60 minutes fire resistance.
  • “Next generation” product – with greater efficiency on site.
  • Compatible with a full range of Nullifire primers and Topcoats.
  • Very low VOC.
  • Optifire®+ unique traceability identifier.
  • Certifire CF5420.

  • Nullifire SC802 provides up to 60 minutes fire resistance to ‘I’ section beams, columns, hollow section columns and cellular beams. Limited 90-minute protection is also available. SC802 can be used on steel, cast iron and galvanised steel.

    Detailed application instructions are available for SC600, SC800 and SC900 series that must be consulted prior to commencing application.

    Safety data sheet must be read and understood before use.

  • Nullifire – Passive Fire Protection Solutions Including Fire Stopping Products and Intumescent Steel Coatings.

Fire Proofing Materiel:

Carbothane 137HS

Carbothane 137 HS is a fast-drying, high build, two component polyurethane coating which exhibits excellent dry times and handling characteristics required by Original Equipment Manufacturers. Has excellent UV resistance and good corrosion resistance in direct to metal applications for C1 to C3 environments, over primers for C4 to C5 environments.

  • Carbothane 137 HS Product Data Sheet
  • Carbothane 137 HS Part A Safety Data Sheet
  • Carbothane 137 HS Part B Safety Data Sheet

  • Fast-drying formulation
  • High build polyurethane coating
  • Two-component system
  • Excellent dry times and handling
  • Ideal for OEM (Original Equipment Manufacturer) applications

  • Nullifire – Passive Fire Protection Solutions Including Fire Stopping Products and Intumescent Steel Coatings.

Fireproofing Spray Application

On-Site Project Demo

Fireproofing the Future of Hospitality in Ras Al Khaimah
Intumescent Projects, News

5-Star Hotel: Fireproofing the Future of Hospitality in Ras Al Khaimah

https://ibtikar-uae.com/wp-content/uploads/2024/05/PHOTO-2024-04-25-20-00-26-1.jpg 960 1280 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-18 11:30:002025-09-25 13:50:575-Star Hotel: Fireproofing the Future of Hospitality in Ras Al Khaimah
RSA Cold Chain
Intumescent Projects, News

Ibtikar Fireproof Safeguards RSA Cold Chain Facility

https://ibtikar-uae.com/wp-content/uploads/2024/03/01-Main-Pictire-RSA-Cold-Chain-.webp 466 1164 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-16 11:26:502025-09-25 13:42:38Ibtikar Fireproof Safeguards RSA Cold Chain Facility
Emtelle
Intumescent Projects, News

Emtelle Blown Fibre and Ducted Network Cable Manufacturing Facility

https://ibtikar-uae.com/wp-content/uploads/2024/01/2-Emtelle.webp 1079 1920 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-16 11:05:442025-09-25 13:42:31Emtelle Blown Fibre and Ducted Network Cable Manufacturing Facility
Amazon Fulfillment Hub in Abu Dhabi
Intumescent Projects, News

Project Complete: Amazon Fulfillment Hub in Abu Dhabi

https://ibtikar-uae.com/wp-content/uploads/2024/05/PHOTO-2022-08-31-18-11-55-2-e1715772221951.jpg 480 1600 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-15 09:21:592025-09-25 13:50:24Project Complete: Amazon Fulfillment Hub in Abu Dhabi
FedEx Sort and Clearance Facility
Cementitious Projects, Intumescent Projects, News

FedEx Cargo Hub Achieves 2-Hour Fire Safety with Ibtikar Fire Proofing

https://ibtikar-uae.com/wp-content/uploads/2015/10/WEB-_P-06-FEDEX.webp 466 1165 admin https://ibtikar-uae.com/wp-content/uploads/2023/12/IBT.svg admin2024-05-15 07:54:242025-09-25 13:50:11FedEx Cargo Hub Achieves 2-Hour Fire Safety with Ibtikar Fire Proofing
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
  • Link to Instagram
  • Link to Youtube
1,400

Hours of Work

April 2024

Project Date

31,000

Surface Area

Steel Structure

Apply on

Nullifire SC802

Material

Contact Us

Saih Shuaib 3, Dubai, UAE

+971 56 765 5161

info@ibtikar-uae.com

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           8 AM – 5 PM
Saturday       8 AM – 5 PM
Sunday         Closed

Latest Projects

  • TECOM Investments WarehouseApril 24, 2025 - 12:53 pm
  • AWR Distribution Center DICSeptember 25, 2024 - 6:08 pm
  • Abu Dhabi Future School Phase 10September 1, 2024 - 11:59 am
  • RSA Cold Chain Phase 2July 24, 2024 - 11:59 am

Our Offices

Ibtikar Fireproofing company

-Silicon Oasis, Dubai

-Mussafah M 45, Abu Dhabi

-Al Musalla, Sharjah

-Al- Salihia Tower 303, Ras Al-Khaimah

-Umm Dera, Umm Al Quawain

 

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter
AWR Distribution Center DIC
Scroll to top

WhatsApp us

Call Us