• Home
  • About Us
  • Services
    • Intumescent Paints
    • Cementitious Paint
    • Solvent Coating
    • Epoxy Intumescent
    • Cable Protective Coating
    • Fabric Fire-retardant
    • Wood Fire Retardant
  • Projects
  • News
  • Careers
  • Contact us
  • Search
  • Menu Menu
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter

35

Hours of Work

December 2021

Project Date

1,100 Sq m

Surface Area

Steel Structure

Apply on

Jotun SteelMaster 1200WF

Material

FARGLORY Al Maryah project - Abu Dhabi
FARGLORY Al Maryah project - Abu Dhabi

About FARGLORY Al Maryah project – Abu Dhabi

At Al Ibtikar Al Hadeeth Technical Works, we take great pride in our fireproofing work, using the latest technologies to ensure maximum protection from fire. As the leading fireproofing company in the UAE, we have completed numerous successful projects, including the Farglory Phase 1 High and Residential Apartments in Abu Dhabi. With a steel surface area of 1100 square meters, we used Sherwin-Williams Phoenix 370-60 and Sherwin-Williams Phoenix 370-90, both high-quality intumescent paints, to provide up to 120 minutes of fire protection. Intumescent paints are specifically designed to expand when exposed to heat, forming a thick, protective layer around the structure. Our expertise in intumescent paint for steel is second to none, and we offer a wide range of fireproofing solutions to meet our clients’ specific needs. We also offer cementitious fireproofing, which is a blend of cement and other materials that provides excellent fire resistance and is ideal for structural steel. Whether you need fireproofing for steel, wood, or spray foam, we have the right product for your needs. At Al Ibtikar Al Hadeeth Technical Works, we are committed to providing the best fireproofing solutions available, using top-quality materials and expert techniques to ensure maximum safety and protection. Our services include fireproofing for steel beams, fireproof insulation, fireproof coatings, flame retardant treatments, and passive fire protection. Contact us today to learn more about our fireproofing services and how we can help protect your building from fire. With our expertise in intumescent fireproofing and cementitious fireproofing, you can trust us to deliver the best results every time.

PreviousNext
12
AMAZON FULFILLMENT CENTER
AMAZON FULFILLMENT CENTER

Jotun SteelMaster 1200WF

Fire Proofing Materiel: Jotun SteelMaster 1200WF

Jotun SteelMaster 1200WF is the most efficient thin-film waterborne intumescent coating for 120 minutes fire protection of structural steel exposed to interior environments. It is ideal for structural steel exposed to a wide range of corrosive environments. SteelMaster 1200WF is low VOC, HAPs free, and has a low environmental impact. It is easy to apply with airless spray for quicker project completion.

Download

  • Jotun SteelMaster 1200WF Application guides
  • Jotun SteelMaster 1200WF Safety Data Sheets Arabic
  • Jotun SteelMaster 1200WF Safety Data Sheets English
  • Jotun SteelMaster 1200WF Technical Data Sheets

Features

  • Low thickness required
  • HAPs free
  • Low VOC, low environmental impact
  • Increases productivity
  • Ready to use, easy airless spray application
  • Quicker project completion

Benefits

  • Fire protection coatings Building – interior
  • Intumescent coatings – cellulosic fire
  • Interior steel protection coatings – buildings
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
  • Link to Instagram
  • Link to Youtube
35

Hours of Work

December 2021

Project Date

1,100 Sq m

Surface Area

Steel Structure

Apply on

Jotun SteelMaster 1200WF

Material

Contact Us

Saih Shuaib 3, Dubai, UAE

+971 56 765 5161

info@ibtikar-uae.com

 

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           8 AM – 5 PM
Saturday       8 AM – 5 PM
Sunday         Closed

Latest Projects

  • AWR Distribution Center DICOctober 1, 2024 - 11:59 am
  • RSA Cold Chain Phase 2September 24, 2024 - 11:59 am
  • Abu Dhabi Future School Phase 10September 1, 2024 - 11:59 am
  • Rubber Belt Manufacturing FactoryJune 23, 2024 - 11:59 am

Our Offices

Ibtikar Fireproofing company

-Silicon Oasis, Dubai

-Mussafah M 45, Abu Dhabi

-Al Musalla, Sharjah

-Al- Salihia Tower 303, Ras Al-Khaimah

-Umm Dera, Umm Al Quawain

 

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter
AquaChemie jebel ali jafzaAquaChemie jebel ali jafzaDHL MEA Innovation Center, Dubai SouthDHL MEA Innovation Center, Dubai South
Scroll to top

WhatsApp us

Call Us