• Home
  • About Us
  • Services
    • Intumescent Paints
    • Cementitious Paint
    • Solvent Coating
    • Epoxy Intumescent
    • Cable Protective Coating
    • Fabric Fire-retardant
    • Wood Fire Retardant
  • Projects
  • News
  • Careers
  • Contact us
  • Search
  • Menu Menu
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter

24

Hours of Work

August 2020

Project Date

145 Sq m

Surface Area

Steel Structure

Apply on

Phoenix™ 370-60

Material

Bla Bla Beach Club Bar & Restaurant
Bla Bla Beach Club Bar & Restaurant

About Bla Bla Beach Club Bar & Restaurant

Al Ibtikar Al Hadeeth Technical Works is the leading fireproofing company in the UAE, providing top-notch fireproofing solutions for a variety of projects. One of the notable projects that we have completed is the BLA BLA BEACH CLUB BAR & RESTAURANT located in Dubai, covering an area of 145 square meters. We used Sherwin-Williams Phoenix 370-60, an excellent intumescent paint for steel structures, to achieve a fire rating of 60 minutes, providing ample protection in case of a fire outbreak.

Intumescent paint is a key component of our fireproofing solution, which helps to slow down the spread of fire, and also provides a barrier between the flames and the structure. At Al Ibtikar Al Hadeeth Technical Works, we use the best quality intumescent paint available in the market, and our team of experts applies it with precision and accuracy to ensure complete fire protection. We also use cementitious fireproofing as another option to protect steel structures.

Our fireproofing solutions are not limited to just intumescent paint, but we also offer passive fire protection services such as fire retardant coatings, flame retardant treatments, and fireproof insulation. We are a complete fireproofing solution provider, and our clients trust us to deliver quality work every time.

At Al Ibtikar Al Hadeeth Technical Works, we understand the importance of using the right material for the job, and we always strive to meet the specific requirements of each project. With our extensive knowledge and experience in fireproofing, we have worked on numerous projects in the UAE, including commercial and residential buildings, warehouses, and industrial facilities.

We take pride in our work and our commitment to providing the best fireproofing solutions. Our team of experts is always ready to take on any project, big or small, and ensure that our clients have complete peace of mind knowing that their property is protected from fire. Contact us today for all your fireproofing needs.

Keywords: intumescent paint, fireproofing, fire protection, fire retardant coatings, flame retardant treatments, passive fire protection, fireproof insulation, fireproof materials, fireproof paint, fireproof construction, fireproof coatings, fire resistant coatings, fireproofing solutions, intumescent fireproofing, flame retardant coatings.

PreviousNext
12
AMAZON FULFILLMENT CENTER
AMAZON FULFILLMENT CENTER

Phoenix™ 370-60

Fire Proofing Materiel: Phoenix™ 370-60

A single component, thin-film, intumescent fire protection coating.

Phoenix 370-60 is a single component water-based TCEP-free thin-film intumescent coating for fire protection of structural steelwork.

Reach out to learn more about our products, or use our Data Sheet search to find the latest TDS and SDS content in any language

Download

  • PHOENIX 370-60 Product Data Sheet
  • PHOENIX 370-60 Safety Data Sheet

Benefits

  • Provides up to 90 minutes fire resistance
  • Application to structural steel hollow and I-sections
  • Highly competitive loadings
  • Easy application properties

Brand

  • Phoenix Manufacturing Ltd.

Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
  • Link to Instagram
  • Link to Youtube
24

Hours of Work

August 2020

Project Date

145 Sq m

Surface Area

Steel Structure

Apply on

Phoenix™ 370-60

Material

Contact Us

Saih Shuaib 3, Dubai, UAE

+971 56 765 5161

info@ibtikar-uae.com

 

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           8 AM – 5 PM
Saturday       8 AM – 5 PM
Sunday         Closed

Latest Projects

  • AWR Distribution Center DICOctober 1, 2024 - 11:59 am
  • RSA Cold Chain Phase 2September 24, 2024 - 11:59 am
  • Abu Dhabi Future School Phase 10September 1, 2024 - 11:59 am
  • Rubber Belt Manufacturing FactoryJune 23, 2024 - 11:59 am

Our Offices

Ibtikar Fireproofing company

-Silicon Oasis, Dubai

-Mussafah M 45, Abu Dhabi

-Al Musalla, Sharjah

-Al- Salihia Tower 303, Ras Al-Khaimah

-Umm Dera, Umm Al Quawain

 

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter
Al Dhaid Project – Phase 2Al Dhaid Project - Phase 2Poland Pavilion | Expo 2020 DubaiPoland Pavilion | Expo 2020 Dubai
Scroll to top

WhatsApp us

Call Us