• Home
  • About Us
  • Services
    • Intumescent Paints
    • Cementitious Paint
    • Solvent Coating
    • Epoxy Intumescent
    • Cable Protective Coating
    • Fabric Fire-retardant
    • Wood Fire Retardant
  • Projects
  • News
  • Careers
  • Contact us
  • Search
  • Menu Menu
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter

400

Hours of Work

January 2022

Project Date

5,031 Sq m

Surface Area

Steel Structure

Apply on

ISOLATEK Type 300

Material

Al Batayeh Military Camp - Sharjah
Al Batayeh Military Camp - Sharjah

About Al Batayeh Military Camp – Sharjah

Al Ibtikar Al Hadeeth Technical Works is a leading fireproofing company in the UAE, specializing in the application of intumescent paint and cementitious fireproofing. One of their notable projects was the Poland Pavilion at Expo 2020 Dubai, which had a steel surface area of 11,000 square meters. To ensure its fire safety, the team used water-based intumescent coatings, specifically Sherwin-Williams Phoenix 370-90 and Phoenix 370-60. These intumescent paints, along with other intumescent paint ingredients, work by swelling up and creating a thick, insulating layer that protects the steel from the heat of a fire. The project was completed in 2020 and had a fire rating of up to 120 minutes, thanks to the fire retardant intumescent coating. Sherwin-Williams Phoenix 370-60 and 370-90 data sheets were consulted to ensure the highest quality of application. Al Ibtikar Al Hadeeth Technical Works takes pride in their work, providing industrial fireproofing and intumescent coatings that are vital for passive fire protection in the UAE. They offer a range of services, including intumescent paint, cementitious fireproofing, cable and duct coating, and fire retardant paint.

PreviousNext
12
AMAZON FULFILLMENT CENTER
AMAZON FULFILLMENT CENTER
ISOLATEK Type 300

Fire Proofing Materiel: ISOLATEK Type 300

CAFCO 300 / ISOLATEK Type 300 is the most innovative, widely specified and used commercial density, Wet Mix Spray-Applied Fire Resistive Material (SFRM) in the world.

CAFCO 300 / ISOLATEK Type 300 is a Gypsum- based formulation that offers the most cost effective fire resistance performance per unit thickness of any commercial SFRM in the world.

The thermal performance advantages of CAFCO 300 / ISOLATEK Type 300 results in reduced installed costs over any commercial density Wet Spray fire protection material in the industry. It also provides industry leading physical performance and application efficiencies that are unsurpassed.

Download

  • ISOLATEK Type 300 Technical Data Sheet
  • ISOLATEK Type 300 Safety Data Sheet
  • ISOLATEK Type 300 Application Guides

Features

  • Designed to provide fire protection for up to 4 hour ratings for various floor and roof deck assemblies, steel beams, columns, and joists in commercial construction projects

Benefits

  • Meets or exceeds all major fire protection specifications for Commercial structures including BS476: Parts 20 & 21, EN1338-1: Parts 3 & 4, ANSI/ UL 263, ASTM E119, CAN/ULC-S101.
  • Provides up to 4 hour fire resistance ratings.
  • Its additional family of products (CAFCO 300 ES / ISOLATEK Type 300 ES and CAFCO 300 SB / ISOLATEK Type 300 SB) provides specific benefits such as eliminating the need for daily priming and flushing out of lines, and easily identified tint for retrofit applications.
  • Offers the most cost effective fire resistance performance per unit thickness of any commercial density SFRM in the world.
  • Exceeds industry in-place physical performance standards.
  • Worldwide manufacturing facilities ensure timely availability.
  • Offers LEED building credits for recycled content.
Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on LinkedIn
  • Share by Mail
  • Link to Instagram
  • Link to Youtube
400

Hours of Work

January 2022

Project Date

5,031 Sq m

Surface Area

Steel Structure

Apply on

ISOLATEK Type 300

Material

Contact Us

Saih Shuaib 3, Dubai, UAE

+971 56 765 5161

info@ibtikar-uae.com

 

Office Hours

Monday        8 AM – 5 PM
Tuesday       8 AM – 5 PM
Wednesday  8 AM – 5 PM
Thursday      8 AM – 5 PM
Friday           8 AM – 5 PM
Saturday       8 AM – 5 PM
Sunday         Closed

Latest Projects

  • 132KV Substation in Al Hudayriat IslandJune 9, 2025 - 12:54 pm
  • AWR Distribution Center DICOctober 1, 2024 - 11:59 am
  • RSA Cold Chain Phase 2September 24, 2024 - 11:59 am
  • Abu Dhabi Future School Phase 10September 1, 2024 - 11:59 am

Our Offices

Ibtikar Fireproofing company

-Silicon Oasis, Dubai

-Mussafah M 45, Abu Dhabi

-Al Musalla, Sharjah

-Al- Salihia Tower 303, Ras Al-Khaimah

-Umm Dera, Umm Al Quawain

 

©2025 Copyright - Ibtikar Fire Proofing - Develop by IBTIKAR
  • Facebook
  • LinkedIn
  • WhatsApp
  • Youtube
  • Instagram
  • Twitter
DHL MEA Innovation Center, Dubai SouthDHL MEA Innovation Center, Dubai SouthAbu Dhabi Future School AL AINAbu Dhabi Future School AL AIN
Scroll to top

WhatsApp us

Call Us